Projects Portfolio

All Timber Frames is a dedicated timber frame construction company based in Cheriton Fitzpaine, eight miles from Exeter.

phone-icon01363 860163
facebook-iconLike us on Facebook

Scout Hut, Sidmouth

325mm Closed Panel System

Scout Hut, Sidmouth

Sid Vale Scout group contracted All Timber Frames to supply the timber frame for their new scout hut in Sidmouth. This is our third public project, which includes a first floor area, climbing wall as well as a fully vaulted hall – the overall building measures 25 x 11 metres with a 325mm closed panel […]

Detached House, Portland

140mm Insulated Panel Frame

Detached House, Portland

140mm insulated panel frame, commissioned by our client in Portland, Dorset – the central part of the Jurassic Coast and a World Heritage Site.

The Boathouse, Stoke Gabriel

235mm Closed Panel System

The Boathouse, Stoke Gabriel

Commissioned by the Stoke Gabriel Boating Association. The Boathouse will provide boat storage on the ground floor, changing facilities and recreational area on the first floor and storage lockers on the second floor. Nautically inspired, Michael Simmons of Critical Mass Architects designed the building shape to resemble an upturned yacht. The frame is a 235mm […]

Cleeve Abbey, Somerset

English Heritage Conservation Project

Cleeve Abbey, Somerset

Cleeve Abbey, managed by English Heritage, commissioned All Timber Frames to support the frame and roof structure for a conservation project. Using seasoned European Oak with stainless steel flitch beams, the frame will create a viewing platform above the rare find of a medieval tiled floor. Dating back to between 1272 and 1300, English Heritage […]

Detached House, Morchard Bishop

235mm Closed Panel System

Detached House, Morchard Bishop

235 Closed Panel Frame with the internals insulated, completed for our client in Morchard Bishop, Devon.

Detached Houses, Mount Hawke, Cornwall

184mm Closed Panel System

Detached Houses, Mount Hawke, Cornwall

This project was for a pair of identical detached houses for a brother and sister in the village of Mount Hawke, Cornwall. Due to a very tight site access we had to tranship the frames onto site using our pick up truck. The frames were then erected using a small city crane. The frames were […]

Primary School Classroom, Christow

184mm Open Panel System

Primary School Classroom, Christow

The frame was a 184mm open panel system and the erection took 4 days to complete. The major challenge with this project was overcoming the lack of direct access to the site of this primary school classroom. The solution was to use a spider crane. These cranes can be moved along narrow pathways and when in […]